Light Durty Overhead Track Crane

Ron, you asked for it.
In preparation for the arrival of my 'new' Victoria U2 milling machine, I felt the need for some kind of crane to help lift the accessories to the table. The vertical milling head is listed at around 100 pounds and the 8" vise at 120 pounds. I had considered a jib crane or a pivoting track. I was looking at the piece of U-track on my garage ceiling that I use to help removing and installing motorcycle engines. It seemed like a good idea. It's the same kind of track used to hang sliding barn doors. A quick check of on-line ads gave me a full set of garage door tracks, including two pieces of U-track for $30.
My setup consists of two 5' tracks running east-west attached to the joists with an 8' track suspended under them on trolleys. A third trolley runs on the 8' track with a block-and-tackle hanging from it. I added an aluminum channel down the middle with a plywood guide pulled by a rope-and-pulley arrangement to move the 8' track along the two 5' tracks without twisting. The lifting trolley is pulled sideways by hand.
<It appears that I can't post pictures. Sorry>
In preparation for the arrival of my 'new' Victoria U2 milling machine, I felt the need for some kind of crane to help lift the accessories to the table. The vertical milling head is listed at around 100 pounds and the 8" vise at 120 pounds. I had considered a jib crane or a pivoting track. I was looking at the piece of U-track on my garage ceiling that I use to help removing and installing motorcycle engines. It seemed like a good idea. It's the same kind of track used to hang sliding barn doors. A quick check of on-line ads gave me a full set of garage door tracks, including two pieces of U-track for $30.
My setup consists of two 5' tracks running east-west attached to the joists with an 8' track suspended under them on trolleys. A third trolley runs on the 8' track with a block-and-tackle hanging from it. I added an aluminum channel down the middle with a plywood guide pulled by a rope-and-pulley arrangement to move the 8' track along the two 5' tracks without twisting. The lifting trolley is pulled sideways by hand.
<It appears that I can't post pictures. Sorry>